Sealing compounds which are conformant with the applicable standards are necessary for proper, professional repairs and building maintenance measures. These are heated up gently to approximately 160 to 180°C and then processed.

Asphalt processing

A - Cutting cracks
Joint milling machine

B - Blowing out, drying and melting
Joint lance

C - Pouring
Joint pouring cooker with lance and shoe

D - Gritting
Gritting machines

Concrete treatment

A - Joint cutting
Joint cutter with diamond disc

B - Cleaning
Joint brush

C- Blowing out
Compressor

D - Pouring
Joint pouring cooker with lance